01
A planning-level land-use category
A zone in the Development Plan. It says what kind of activity the plan envisages for an area. It is a planning designation applied at area level.
Dholera Discovery
The Development Plan divides Dholera SIR into eighteen broad land-use zones. This page gives the published area for each, and is equally careful about what a land-use category does not tell you.
The schedule
Every zone in the plan’s land use budget, with the area and the percentages as printed in Table 3-2 of the Development Plan.
91,970 ha
Total site area
56,739 ha
Developable area — 61.7% of the site
35,231 ha
Under Coastal Regulation Zone I — 38.3%
| No. | Zone | Area (ha) | % of developable | % of site |
|---|---|---|---|---|
| Group A URBAN Ten zones · subtotal 33,846 ha | ||||
| 1 | Residential | 9,780.26 | 17% | 10.6% |
| 2 | High Access Corridor | 2,465.11 | 4% | 2.7% |
| 3 | City Centre | 679.08 | 1% | 0.7% |
| 4 | Industrial | 11,457.36 | 20% | 12.5% |
| 5 | Logistics | 203.64 | 0% | 0.2% |
| 6 | Knowledge and IT | 1,229.97 | 2% | 1.3% |
| 7 | Recreation, Sports and Entertainment | 4,500.29 | 8% | 4.9% |
| 8 | Roads | 2,644.51 | 5% | 2.9% |
| 9 | Strategic Infrastructure | 323.33 | 1% | 0.4% |
| 10 | Public Facility Zone | 562.11 | 1% | 0.6% |
| A | Subtotal — Urban | 33,846 | 60% | 37% |
| Group B NON-URBAN Six zones · subtotal 22,893 ha | ||||
| 11 | Tourism – Resorts (CRZ III) | 3,888.83 | 7% | 4.2% |
| 12 | Green spaces | 1,960.12 | 3% | 2.1% |
| 13 | Village Buffer | 1,325.37 | 2% | 1.4% |
| 14 | Existing Village Settlements | 446.92 | 1% | 0.5% |
| 15 | Agriculture | 12,804.15 | 23% | 13.9% |
| 16 | Rivers, Canals and Other Water bodies | 2,467.71 | 4% | 2.7% |
| C | DEVELOPABLE AREA (A + B) | 56,739 | 100% | 61.7% |
| Group D LAND UNDER CRZ I Two zones · subtotal 35,231 ha | ||||
| 17 | Solar Energy Park | 1,345.92 | — | 1.5% |
| 18 | Land under CRZ I | 33,885.23 | — | 36.8% |
| E | TOTAL SITE AREA | 91,970 | — | 100% |
Development controls
A land-use zone says what kind of activity is expected. The GDCR says what may be built — and it says it by the width of the road the plot fronts, not by one regional number.
A proposed street right-of-way must be of sufficient width for the required cross section, and in no case less than these standards unless the Regional Development Authority engineer certifies that special circumstances make it unnecessary or impractical.
| Road the plot fronts | Max FAR | Max ground coverage | Max height | Setbacks |
|---|---|---|---|---|
| 55 m and above | 2 | 60% | G+5 or 18 m, whichever is less | 5-6-6-6 m |
| 25 m to below 55 m | 1.5 | 60% | G+3 or 15 m, whichever is less | 5-5-5-5 m |
| Below 25 m | 1 | 50% | G+2 or 10 m, whichever is less | 3-3-3-3 m |
| Road the plot fronts | Minimum plot | Max FAR | Max ground coverage | Max height | Setbacks |
|---|---|---|---|---|---|
| 55 m and above | 5000 sqm | 5 | 0-10% | 150 m | 10-8-6-6 m |
| 55 m and above | 5000 sqm | 4 | above 10-20% | 126 m | 9-7-6-6 m |
| 55 m and above | 5000 sqm | 3 | above 20-30% | 32 m | 8-6-6-6 m |
| 25 m and below 55 m | 1500 sqm | 2.5 | 40% | 20 m | 8-6-6-6 m |
In this table the maximum FAR column and the maximum ground coverage column appear to be transposed against one another. The values are reproduced exactly as printed and the inconsistency is recorded, not corrected.
Source DSIRDA, 'Final Report - 2: General Development Control Regulations (GDCR)', Gandhinagar. Sanctioned 2012-09-10.
The important distinction
A land-use category is the one thing everyone can read from a plan. It is the one thing that proves the least about any individual piece of land. Keeping them apart is the whole point of this page.
01
A zone in the Development Plan. It says what kind of activity the plan envisages for an area. It is a planning designation applied at area level.
02
Who owns a particular parcel, and with what encumbrances. Title is established by the land records and by a lawyer’s search. This page does neither and cannot.
03
Whether a specific plot may be built on, and to what standard, depends on the Town Planning Scheme that covers it, the GDCR, and the conditions in that scheme’s schedule.
04
Whether a plot can be bought or leased today is a question about a particular owner and a particular transaction. Top Dholera does not hold land and publishes no availability.
Top Dholera’s educational content is not a title search, not a legal opinion, and not a plot approval verification. We source and coordinate resources for construction work. We do not verify land, and we will not pretend a map can.
Your requirement
Selecting a zone adds it to your enquiry message so we can start from the right place. It is entirely optional, and it does not imply that land in that zone is available.
If you know what kind of area your project is in, select it and it will be added to your enquiry. If you do not, leave it — we will ask.
Discuss a land requirement
Send the plot size, the land use you have in mind and the location. We will come back with what we can actually support — and tell you plainly when a question needs a lawyer rather than a brochure.
Only the essentials are needed to start. Everything is optional — you can send what you have and we will ask for the rest.